How much does an EV charging station cost to install?
6 min read
5 min readupdated
Fot. cottonbro studioWant to install a charger just for yourself — in your own parking space in the garage or apartment block car park? The cables and power supply almost always run through common property, so you need the consent of the housing community or housing co-op. However, Poland’s Electromobility Act gives you a right to it and a clear procedure. We explain how to go through it step by step, how much it costs and how to bill the energy.
This article concerns a charger for individual use: a single charging point in a parking space used exclusively by you, for charging your own car. The charger is not made available to other residents or outside drivers.
This is a different situation from shared charging infrastructure for the whole building, used by many residents. Such an installation requires a resolution of the association, a collective assessment and design, and — if made available for a fee — UDT inspections as well; we cover this at the end of the article.
The right to install a charging point in a multi-family building is governed by Article 12b of the Act on Electromobility and Alternative Fuels. An application can be submitted by a person who:
An assessment is not needed if the building was designed and built from the outset with an installation intended to supply charging points. The procedure is as follows:
Consent for a charger for individual use does not depend on your neighbours’ discretion. The board can only refuse in specific situations, including when:
The costs are borne by the applicant: the assessment, design, charger, installation and any connection work. The association does not contribute to your charger — and it should not contribute to the energy you use either.
At Domena Power, the assessment with design costs 3,000 zł net (3,690 zł gross) for the first point. If several neighbours apply at the same time, each additional point in the same property is only 330 zł net (405.90 zł gross) — the cost per person drops several times over. Installation including materials usually costs 3,500–6,000 zł.
The installation cost depends on the distance from the switchboard and the conditions in the building. We will prepare an exact quote individually.
Connecting the charger to your own apartment’s meter is rarely possible in an underground car park — they are usually several floors apart. In practice, the charger is supplied from the common-area installation, so consumption has to be measured and billed reliably.
This requires a charger with a MID-certified meter (or a MID submeter upstream of the charger). Based on its readings, the property administration issues debit notes to the owner according to the actual cost of 1 kWh. With the Domena Power system, readings reach the panel remotely — the property manager doesn’t need to visit the site to write down meter readings, and you can see consumption and cost in the app.
A charger for your own use, not used to provide a charging service to others, is as a rule not subject to UDT inspections.
When several residents are interested, it is worth considering a joint project instead of individual applications. A single collective assessment with dynamic load balancing (DLB) allows more points on the existing connection and lowers the cost per person. However, such an installation requires a resolution of the association, and chargers made available for a fee to many users require UDT inspections.
This article is for information only and does not constitute legal advice. It is worth consulting the details of the procedure for your specific building with the property manager or a lawyer.