Charger in an underground garage: board consent, expert assessment and installation
Do you have your own parking space in your block's garage? You can install a charger on it. The board has 30 days to commission the expert assessment, and we prepare the request and documents, install the charger and bill the electricity used.
Service area: Łódź, Masovian, Greater Poland, Lesser Poland, Pomeranian, Lower Silesian and Silesian voivodeships (incl. Łódź, Warsaw, Poznań, Gdańsk, Gdynia, Kraków, Wrocław, Katowice)

How it works, step by step
We guide you through the whole process: from the request to the board to installation and billing for electricity.
- 1
Request to the board
We provide a ready-made template for the request to the board of the housing community or housing cooperative. It covers all the formal points required by Article 12b of the Polish Electromobility Act: legal title to the flat and the parking space, the consent of the flat owner if you are not the owner, responsibility for the installation and its operation, and a commitment to cover the costs.
- 2
Who pays the costs
The expert assessment, the installation and the connection of the charger are paid for by the applicant, that is, the resident. The housing community does not contribute to your charger, and you pay for the electricity you use according to the meter.
- 3
Building documentation
From the board or the building management we need the electrical installation design of the building, if available, the connection conditions or the distribution contract stating the connection capacity, and a floor plan of the garage showing the distribution board and the parking space. From you: photos of the distribution board, the parking space and the cable route between them.
- 4
Completeness check
We check whether the documents are enough for the expert assessment. If anything is missing, we tell you exactly what, or we come for a site visit.
- 5
Contract
Once the documentation is complete, we sign a contract for the expert assessment and the design at price list rates.
- 6
Expert assessment with design options
The expert assessment evaluates the building's electrical installation and includes several design options, each with its cost, advantages and disadvantages. The board grants consent on that basis.
- 7
Installation
Once the board has given consent, installation takes between 3 days and 2 weeks, and a licensed electrician hands over the as-built documentation.
Connection options we check
In the expert assessment we compare ways of supplying power to the charger and point out the one that will be cheapest for you to run.
From the common area meter
The charger is supplied from the garage installation, behind the building management's meter, with an MID sub-meter. You pay the housing community for the energy according to the sub-meter, and the Domena Power system assigns the consumption to you.
From your flat's meter
A cable runs from your flat's distribution board or meter to the parking space. You pay for charging in your flat's electricity bill. This option depends on the length and route of the cable.
Your own grid operator meter
A separate point of supply with its own contract with the grid operator, for the charger only. If needed, we build the connection from scratch. You pay for the energy directly to the supplier.
Chargers we install
We install devices from proven, reputable manufacturers, selected impartially to suit your car and connection.
When the housing community hesitates
Consent does not depend on a vote among the neighbours. Under Article 12b of the Electromobility and Alternative Fuels Act, the board has 30 days from the request to commission an expert assessment. In a housing community, consent for a charger below 11 kW is a routine management decision (czynność zwykłego zarządu), so the board grants it itself, without a resolution of the owners. Domena Power prepares the request, delivers the assessment and helps the board answer questions about power, protective devices and fire safety. On request, it handles all the formalities with the board on the resident's behalf, under a power of attorney.
The assessment required by the Electromobility Act is not the whole story. Fire safety regulations may require a separate fire safety assessment (ekspertyza ppoż.) for the garage, depending on the building, the number of parking spaces and how the garage is separated off from the rest of the building. Domena Power establishes whether one is needed while verifying the documentation.
Procedure in detail: housing community consent for a chargerCosts
According to the Domena Power price list, the feasibility assessment for the first charging point costs 3 075 zł brutto (2 500 zł netto), and the electrical installation design is a further 1 845 zł brutto (1 500 zł netto) for the first point. Each additional point in the same documentation costs 369 zł brutto (300 zł netto) for the assessment and 246 zł brutto (200 zł netto) for the design, so two neighbours filing one request pay less per person than each filing separately. Fire safety sign-off of the design by a certified fire safety expert (rzeczoznawca ppoż.), if the building requires it, costs from 1 230 zł brutto (1 000 zł netto), once for the whole documentation, and the final price depends on the building type. Where fire safety regulations require a separate fire safety assessment, the fire safety expert signs that assessment instead of signing off the design, and its price is set after the garage documentation has been verified. Amounts are given incl. VAT (brutto) and excl. VAT (netto).
The charger and the installation have no price list rate. The amount depends on what the assessment shows: which type of charger can be used in this garage, whether a load management system is needed, whether an energy billing system is needed, whether additional protective devices are needed, as well as the distance to the distribution board and the cable cross-section. The assessment usually includes several options, so you can choose the one that fits your needs and budget.
Calculate the cost of your documentation
Enter the number of charging points and we will calculate the net and gross amount incl. 23% VAT.
Cheaper with neighbours: the more charging points in one set of documentation, the lower the cost per person. Each additional point costs 369 zł brutto (300 zł netto), so neighbours who file a request together pay less than each filing separately.
Number of charging points
We price the assessment and design per point; fire-safety sign-off once per building.
* Applies to connection to the building’s existing distribution board, provided the full required electrical documentation and floor plans are supplied.
Questions people ask most often
- The board refuses consent if the expert assessment shows that the installation is not possible, if the applicant has no legal title to a flat in the building and to a parking space for their exclusive use, if they have not provided the required consent of the flat’s owner, or if they have not committed to cover all costs of installation and connection to the grid. Reluctance on the part of the neighbours is not grounds for refusal.
- Sometimes. The Electromobility Act requires an expert assessment approving the installation of a charging point. Independently of that, fire safety regulations may require a fire safety assessment for the garage. Domena Power checks this at the documentation stage and says straight away whether this building will need one. If it does, the fire safety expert's signature goes on the assessment, not on the design sign-off.
- The board has 30 days to commission the expert assessment. Installation takes between 3 days and 2 weeks, depending on the length of the cable route and the work at the distribution board. The paperwork on the housing community's side takes the most time.
- A charger installed by Domena Power has its own meter, and the app shows the energy drawn in kWh. How it is paid for is agreed with the housing community: through its meter, through the resident's sub-meter or through a separate contract with an electricity supplier.
- A charger up to 11 kW usually fits within the spare capacity of the building's connection. Where there is no spare capacity, a load management system slows charging down when the building is drawing more. The assessment works this out.
- Yes, with the written consent of the owner of the flat and the parking space. The rest of the procedure is the same.
Check whether a charger can be installed in your garage
Tell us which building your parking space is in. We will call or write back within 1 business day. The first conversation is free. The assessment follows the price list; installation is quoted individually.
Office
Working days, 8:00–18:00
Technical support
Every day, 8:00–22:00

This is what a finished charger on a parking space looks like
Łódź · residential estate, ul. Rewolucji 1905 roku 69
See the project