Domena Power
Fire-safety report and UDT technical inspection of a Domena Power charging station
Reports and inspections service

Fire-safety report and UDT technical inspection for charging stations

We prepare fire-safety reports and opinions and compile and reconstruct the documentation needed for the UDT technical inspection of a charging station. We guide you through the whole process — from surveying the site and the fire-safety expert opinion, through the full set of documents, to submitting the station for the UDT inspection and its authorisation for operation.

Scope of the service

We take on the report, the documentation and the whole process

We do not leave you with the formalities. We prepare the fire-safety opinion, compile and reconstruct the UDT documentation, and then run the submission all the way to the station being authorised for operation.

  • Fire-safety report and opinion

    We prepare a fire-safety expert opinion for the charging station — compliant with the building fire-safety requirements and ready for the UDT application.

  • Documentation for the UDT inspection

    We compile the documentation needed for the UDT technical inspection, and where it is missing we reconstruct the installation data on the basis of measurements and calculations.

  • Guidance through the whole process

    We submit the station for the UDT inspection and take you through all the formalities — all the way to the charger being authorised for operation.

Fire-safety expert

When is the signature of a fire-safety expert required?

The signature of a fire-safety expert is a verification of the site against the current regulations and confirmation that the charging installation design complies with the building fire-safety requirements set by the designer. For individual (private) chargers this applies primarily to multi-family buildings and underground garages. For internal (shared) and public (openly accessible) chargers, however, the opinion is required at every site — regardless of the installation location, including stations standing outside, beyond the building.

In particular, the expert checks the integration of the charging station with the building’s active fire-protection systems:

  • Fire alarm system (SSP) and notification.
  • Manual call points (ROP).
  • Fire disconnect switch (PWP).

If any of these systems is triggered, the charging stations must be disconnected from charging.

The expert also verifies that the design is consistent with the division of the building into fire zones — including the correct execution of installation crossings through zone boundaries (penetration seals of the required fire resistance), so that the chargers’ cable routes do not compromise the separation of the fire zones.

In practice, in the vast majority of cases (about 99%) the expert imposes no significant design requirements on the building. Nor are separate emergency power-disconnection systems used for a single charger — if the charger is inside a building, it is disconnected globally together with the whole fire zone, not individually. Emergency disconnect switches of this kind are used only outdoors, beyond the building.

UDT technical inspection

When is a UDT technical inspection required?

Charging stations are subject to a technical inspection by the Office of Technical Inspection (UDT) before being authorised for operation. Whether the inspection is required depends on who uses the charger.

UDT technical inspection required

  • Public (openly accessible) chargers — available to everyone, in various locations, usually not tied to a specific site and not intended for a closed group of users, e.g. at commercial car parks or public-use facilities.
  • Internal chargers — shared within a site, e.g. in a homeowners’ association garage, hotel or office building, for tenants, employees and guests. With no access from outside.

UDT technical inspection not required

  • An individual charger — a single point for one user, e.g. a wallbox in a single-family house or at an individual parking space in the garage hall of a multi-family building.

Which documents are required for the UDT inspection?

A full set of charging-station documentation is attached to the UDT technical-inspection application. We compile it, and where it is missing we reconstruct it on the basis of measurements and calculations.

  • Application for a technical inspection to the relevant UDT branch.
  • Technical documentation of the station: wiring diagram, description and rated data.
  • Fire-safety expert opinion.
  • EU declarations of conformity and CE certificates of the charging station.
  • Electrical measurement reports: protection against electric shock, insulation resistance, continuity of protective conductors and testing of residual-current devices.
  • Operating manual for the charging station.
  • Statement of correct execution of the installation by an authorised person.

The exact scope of documents is confirmed by the relevant UDT branch — it depends on the type and power of the station.

How we work

We guide you through the whole process — step by step

  1. 1

    Site survey

    We analyse the installation, the type of station and the way it is used, to determine whether a fire-safety opinion and a UDT inspection are needed.

  2. 2

    Fire-safety opinion

    A fire-safety expert prepares an opinion for the charging station, compliant with the building fire safety.

  3. 3

    Compiling the documentation

    We gather and — where needed — reconstruct the installation documentation required for the UDT technical-inspection application.

  4. 4

    UDT inspection

    We submit the station for inspection and see it through to the charger being authorised for operation.

Pricing and quotes

How much the report and documentation cost

Starting prices for selected services. We confirm the exact quote after surveying the site.

  • Individual fire-safety analysis

    from 1000 złnet / analysis

    1230 zł gross (incl. 23% VAT)

    Full photo-and-description documentation of the site in terms of fire safety, signed by an authorised fire-safety expert.

  • Station measurements and reconstruction of UDT documentation

    Customquote

    Electrical measurements of the station together with compiling and reconstructing the documentation required for the UDT technical inspection, signed by an electrician holding construction qualifications.

Looking for the inspection and measurement of a working charger? You will find the pricing and inspection calculator on the Installation and service page.

Frequently asked questions

  • These are two different things. A fire-safety expert opinion confirms that the charging station complies with the building fire-safety requirements. The UDT inspection is a technical examination of the station by the Office of Technical Inspection before it is authorised for operation. The fire-safety opinion is one of the documents attached to the UDT inspection application.

After the fire-safety report and the UDT inspection, we move on to installation and service and to launching the billing system. For multi-family buildings, see also billing charging in a housing community.

Need a fire-safety report or a UDT inspection?

Book a call

Let’s talk about working together

Call or write — we’ll answer your questions about assessment, installation and charger billing. You can also leave an enquiry in the form beside this.

I am interested in:

You can select several options.

Provide it if you are enquiring on behalf of a housing community or company. Individual clients can leave it blank.

Leave a number if you prefer a call. Otherwise we will reply by e-mail.

Tell us about the project: type of property, number of charging points, location. It helps us prepare a quote.