EV-ready building: ADM meter, load balancing and PV
9 min read
10 min readupdated
Fot. Jakub ZerdzieckiThe first electric car in the garage usually means one application for a charger. The next ones arrive sooner than the board expects, and if each is handled separately, within a few years the building has a tangle of cables, no spare power left — and no way to connect the next residents who want to charge. This guide is for the board of a housing community or housing co-op: how to take the initiative, gauge demand with a three-question survey, build one installation with MID meters and dynamic load balancing, share the costs fairly and manage it all remotely.
Poland’s Electromobility Act gives a resident the right to a charger in their own parking space. Each application starts a separate procedure: the board has 30 days to commission an assessment, and it cannot refuse consent on any grounds other than those listed in Article 12b. With several applications, each new one gets less spare power, and separate cables from the flats’ meters run through ceilings and stairwells.
A board with a plan answers the first application differently: “join the shared installation”. A shared system does not take away anyone’s rights under Article 12b, but it offers a cheaper and simpler route — one set of documentation, one switchboard and billing that runs itself.
The installation that works best is one where a single measurement serves two purposes. The MID meter at each charger provides the reading used both to control power and to bill the resident. As a result, the building does not need separate systems for control and for billing.
Before the board orders a design, it needs numbers, not opinions from a meeting. The fastest way to get them is a short survey: three questions, and each resident ticks the one that applies to them. It takes a minute, so most units respond. Add only the unit number and the parking space number to the survey.
Example: a building has 72 units and 60 garage spaces, and 48 units returned the survey. 8 residents declared a charger installation and power take-up, 16 plan to charge in the building without a declaration, and 24 units are not interested in charging in the building. The first stage is 8 chargers, and the infrastructure is designed for 24 points (8 + 16), i.e. 40% of the spaces.
Energy is not the problem here. An electric car driven in the city typically uses 150–250 kWh a month, or around 6–8 kWh a day. So 24 cars need a total of around 170 kWh overnight. If the building has 30 kW of free power at night, over 8 hours it can deliver 240 kWh to the chargers — with room to spare. With a rigid allocation, the same 24 points at 11 kW each would take up 264 kW, many times more than a typical grid connection provides.
An illustrative calculation. The available power and the simultaneity factor are determined by the designer after a power assessment of the specific building.
Shared infrastructure for many residents goes beyond ordinary management, so a housing community needs a resolution of the owners, and a housing co-op needs a decision by its governing bodies in line with its statute. The resolution settles the investment, and the regulations describe the day-to-day rules.
The meters at the chargers are part of the shared installation and belong to the community. It is the community that, by resolution, recognises them as the basis for billing residents and ensures they remain metrologically valid. MID conformity assessment replaces initial verification, and re-verification must be scheduled within the period set by the regulations on measures.
Readings do not require a walk round with a clipboard. The charger sends the meter reading from the start and end of each session to the Domena Power system, and the board receives a per-unit statement, ready for a debit note. The submeter total also shows how much of the energy on the ADM invoice is for charging and how much for the common areas, so the cost split is clear to everyone without extra work for the administration.
Meters used for billing are subject to legal metrological control regulations (Poland’s Law on Measures). We confirm the requirements for each specific billing model individually.
The documentation cost per point falls as the number of points grows. At Domena Power, a collective assessment with design for one building costs 4,000 zł net for the first point and 500 zł net for each additional one — for 8 points, that is 7,500 zł net, or 937.50 zł net per point. Approval by a fire-safety expert can be added as an option (from 1,000 zł net, one-off, depending on the building type). From 20 points, e.g. the 24 points in the example, we set the price individually.
Documentation prices are net, indicative for one building connected to an existing switchboard. You will find the current price list and documentation calculator on the “Assessments and designs” page (linked under “Related services” below the article). This article does not constitute legal advice — it is worth consulting the cost-sharing rules with your property manager or a lawyer.
Most of the work in a building with chargers is not the installation but the day-to-day running: readings, debit notes, new users, sold flats and questions like “why is my car charging more slowly?”. With the Domena Power system, the board or property manager handles all of this from a single panel.
You do not have to coordinate five companies. Domena Power takes the community through the whole process: from the power assessment and collective assessment, through installing chargers with MID meters and dynamic load balancing, to the billing system and servicing. The community becomes its own charging operator — it sets the rates and access rules itself, and pays a flat subscription for the system with no commission on energy: 10 zł net a month for every charger, with no higher rate for the first one. For 8 chargers, that is 80 zł net a month.
To get started, the three questions from this article are all you need. Get in touch with your survey results — we will prepare a power assessment and a staged plan for your building.
Subscription prices are net, excluding VAT. From 20 charging points, we prepare an individual quote.
We handle the entire process turnkey — see how we can help:
9 min read
5 min read
8 min read
4 min read
Call or write — we’ll answer your questions about assessment, installation and charger billing. You can also leave an enquiry in the form beside this.
Working days, 8:00–18:00
Every day, 8:00–22:00