Before chargers appear in a building, you need to check whether the installation has spare capacity for them. This assessment determines how many points can be connected, whether the grid connection will need upgrading and how much it will all cost. We explain what a power assessment involves, what to do if documentation is missing and how to fit more chargers on the existing connection.
A charger is one of the largest loads in a building: a single 11 kW point draws as much as several apartments at peak. Connecting chargers by guesswork risks tripping protective devices, overheating cables and, in extreme cases, a power cut for the entire building.
A power assessment answers three questions: how much power the building has available, how much it actually uses and how much is left for charging. On that basis, the installation assessment and charger installation design are prepared.
Older buildings often lack complete electrical documentation, or it does not reflect the actual state. This does not block the project. We reconstruct the data from an on-site survey, measurements and calculations, and then prepare an overview diagram of the installation, which becomes the basis for the assessment and design.
A building has a connection capacity of 80 kW, and measurements show a peak of 45 kW in the evening and approx. 20 kW at night. After deducting a safety margin, approx. 25 kW is left in the evening, and much more at night.
Without load management, only two 11 kW chargers would fit here, because each needs its full power reserved. With dynamic load balancing (DLB), the same building can serve a dozen or more points: the system shares the available power among the cars that are charging and limits it in the evening, when the apartments’ consumption rises. At night, when cars are parked longest, they charge at higher power.
Illustrative example. The actual spare capacity and number of points result from the measurements and assessment of the specific building.
Limited spare capacity does not mean chargers cannot be installed. Before the housing community decides on an expensive connection upgrade, it is worth checking cheaper options:
At Domena Power, the power assessment is part of the charging installation assessment and design. The complete documentation package costs 3,000 zł net (3,690 zł gross) for the first point and 330 zł net (405.90 zł gross) for each additional one in the same property. After the rollout, the Domena Power system keeps power limits in check, manages the load dynamically and shows charging peaks in the panel.
We handle the entire process turnkey — see how we can help:
4 min read
4 min read
3 min read
Call or write — we’ll answer your questions about assessment, installation and charger billing. You can also leave an enquiry in the form beside this.